Product information
climbing structure Terion
climbing structure Terion
Material | softwood pressure-impregnated |
---|---|
Scope of delivery |
4x post structure: softwood 4x post shoe: galvanised steel 1x climbing net: plastic-coated steel cable |
Minimal space | 6,15x6,15x3,25 m |
Playvalues | |
Age | |
Ex works | no |
Material | softwood pressure-impregnated |
---|---|
Minimal space | 6,15x6,15x3,25 m |
Fall protection netto | 35,0 m² |
Freefall height | 145 cm |
Foundation level | ET 400 |
Foundation | 4x CF |
Soil quality | at least sand |
Catalogue index | climbo Climbing unit |
Tender text
?: Climbing unit Terion SW pi, FL 1 natural
Recommended age group: from 3 years
Scope of delivery: 4x post structure: softwood
4x post shoe: galvanised steel
1x climbing net: plastic-coated steel cable
Minimum space: 6,15x6,15x3,25 m
Free falling height: 145 cm
Assembly: 2 persons/4 h
Ground constitution: at least turf
Foundations: 4x CF
Impact protection net: 35,0 m²
Certificate: -
?: -
Article no.: -
Description: climbing structure Terion
CO2 emissions of the product
330,8 kg
Share of renewable raw materials
0.85%
Share of recycled material
0.09%
Weighted emission factor of the product
**
<2
1,1 kg CO₂e/kg
2-3
>3
Disclaimer
The present dashboard for the Circularity Index of the "Circular Product" certification was automatically generated and is based on the corresponding certification of eibe Produktion + Vertrieb GmbH & Co KG, Industriestraße 1, 97285 Röttingen, which was issued on May 16, 2024, using the example product Play System Albion from the eibe unique® product series by the Gesellschaft für Klimaschutz München GmbH (GKM GmbH). Responsibility for the accuracy of the content lies with eibe Produktion + Vertrieb GmbH & Co KG. The basis for awarding the private-sector "Circular Product" certification by GKM GmbH can be viewed at gesellschaft-klimaschutz.de/zertifizierung/zirkularitaet/.
** The CO2e emissions of the materials used in the product are taken into account. The emissions that arise during the production process are allocated to the product on a pro-rata basis.